![]() Arlington County Water Pollution Plant Arlington County Water Pollution Control PlantArlington County, VAEnviron-Civil Engineering provides the quality assurance inspection of the expansion and other upgrades of the Arlington County Water Pollution Control Plant in Alexandria, Virginia. See More |
![]() Little Patuxent Water Reclamation Plant Little Patuxent Water Reclamation PlantSavage, MDECE provided construction management and inspection services at the Little Patuxent Water Reclamation Plant. See More
|
![]() Patuxent Elementary School Patuxent Elementary School GymnasiumUpper Marlboro, MDECE provided engineering materials testing and inspection services during the construction of the school gymnasium. The services provided included Structural Steel testing and inspection of steel joists during construction, field testing to ensure that materials and procedures meet design specifications, remedial action recommendations and progress reports. |
![]() Patuxent WRF Patuxent Water Reclamation FacilityCrofton, MDECE is contracted to provide construction inspection services at the 7.5 MGD Patuxent Water Reclamation Facility during the construction of the Enhanced Nutrient Removal (ENR) Upgrades. The objective of the ENR upgrades is to reduce the nutrients to the Lower Chesapeake Bay by achieving and effluent with Total Nitrogen (TN) goal of 3 mg/l and Total Phosphorus of 0.3 mg/l. |
![]() Broadneck WRF Broadneck Water Reclamation FacilityAnnapolis, MDECE is contracted to provide construction inspection services at the 6.0 MGD Broadneck Water Reclamation Facility during the construction of the Enhanced Nutrient Removal (ENR) Upgrades. The objective of the ENR upgrades is to reduce the nutrients to Chesapeake Bay by achieving and effluent with Total Nitrogen (TN) goal of 3 mg/l and Total Phosphorus of 0.3 mg/l. |
Construction Monitoring ProjectsECE provided construction monitoring services to various clients in a wide range of projects across the state of Maryland. The type of projects ranged from water & wastewater, pumping stations to stream bank stabilization. Services provided by ECE included weekly and monthly site visits, RFI review, change order analysis, progress meetings, reports and other documentation. Click Here to see some of these projects |