Environmental Management

Phase I and II Environmental Site Assessment

ECE performed numerous Phase I and Phase II Environmental Site Assesment Studies. ECE environmental professionals reviewed and analyzed background information of the properties, performed site inspections, interviewed people with knowledge of site areas, reviewed environmental records, and documented findings in a report prepared for the clients. Some of the locations where ECE provided these services are listed below.

  • Sneed Property –Washington DC
  • Anita Restaurant – McLean, VA
  • Diamond Construction – Oxon Hill, MD
  • Al Bertz Property – Baltimore, MD
  • Norbeck Country Club – Rockville, MD
  • Whirland Corporation – McLean, VA
  • Olam Tikvah Congregation –Fairfax, VA
  • eZ-Storage – Rockville, MD
  • eZ-Storage – Ellicott City, MD
  • eZ-Storage – Gaithersburg, MD
  • eZ-Storage – Baltimore, MD
  • eZ-Storage – Gaithersburg, MD
  • 2400N Property – Washington, DC
  • Chase Quarry – Jessup, MD
  • Waverly Shopping Plaza – Baltimore, MD
  • High ‘s Store – Elkton, MD
  • High’s Store – St. Michaels MD
  • Coleman Honda – Clarksville, MD
  • Top Gun Automotive – Waldorf, MD
  • Little Glen Shopping Center – Glen Burnie, MD
  • Parkview at Miramar Landing – Baltimore, MD
  • Highs’s Store – Elkton, MD
  • Montgomery Concrete, Rockville MD

Tyndall AFB

Oil-Water Separator Efficiency Study

Tyndall AFB, FL

ECE performed a study to determine the efficiency of oil-water separators in treating Tyndall AFB wastewater. ECE investigated and characterized the processes and activities which occur at each oil water separator (OWS). ECE also investigated the capability of existing OWS to provide sufficient pretreatment to comply with the Bay County Advanced Wastewater Treatment (AWT) Standards, and recommended cost-effective solutions that would meet the Bay County AWT  Standards.



Hazardous Waste Management Plan

Pope AFB, NC and other locations

ECE revised and updated the hazardous waste plan for the base as well as reviewed applicable Air Force instruction and federal and state regulations. We conducted site visits at each facility operating on base, interviewed facility personnel, reviewed records, inspected waste accumulation points and documented waste minimization management practices. The plan provides guidance for the management of hazardous waste by establishing procedures for proper waste accumulation, storage and transportation from point of generation to final disposition. Other locations include:

  • Brentwood Major Repair and Overhaul Yard – Washington, DC
  • Landover Bus Garage – Landover, MD
  • Greenbelt Rail Yard Facility – Greenbelt, MD
  • 14th Street Bus Facility – Washington DC
  • New Carrollton Rail Yard Facility – New Carrollton, MD

Biotreatment Pilot Study

Southeastern Division Bus Garage and Bladensburg Bus Garage in Washington, DC

ECE performed an environmental study to determine appropriate treatment of wastewater from the bus facility. The wastewater generated from bus washing and engine steam cleaning activities at the facility flows through a gravity Oil/water separator (OWS) prior to discharge to the combined sewer system that flows to Blue Plains Wastewater Treatment Plant (WWTP). ECE performed cost analysis of treatment alternatives and provided recommendations after comparing the biological treatment with the other existing technologies that were applicable to the site.

SPCC Plans

Spill Prevention Control and Countermeasure Plans

ECE prepared Spill Prevention Control and Countermeasure Plans for various clients in accordance with 40 CFR part 112. The SPCC Plans prepared by ECE helped the clients demonstrate their compliance with the regulations. Some of the facilities where ECE prepared SPCC Plans are:

  • SunTrust Bank Operations Center – Glen Burnie, MD
  • SunTrust Bank Headquarters – Richmond, VA
  • SunTrust Bank Riverview Center – Richmond, VA
  • JFK Maintenance and Inspection Station – Perryville, MD
  • Nice Bridge Maintenance Facility – MD
  • Ft. McHenry Maintenance Facility – Baltimore, MD
  • Bay Bridge Maintenance Facility – Annapolis, MD
  • JFK Maintenance I – Baltimore, MD
  • FSK Bridge Maintenance Facility – Baltimore, MD
  • Brentwood Major Repair and Overhaul Yard – Washington, DC
  • Landover Bus Garage – Landover, MD
  • Greenbelt Rail Yard Facility – Greenbelt, MD
  • 14th Street Bus Facility – Washington, DC
  • New Carrollton Rail Yard Facility – New Carrollton, MD

Crownsville Wall

Stormwater Management and Pollution Prevention

ECE prepared stormwater management plan that addresses pollution prevention during the construction of the 178-foot span pedestrian bridge. The primary objective was to prevent the pollutants from reaching the southwest creek during the mobilization and construction activities. Other facilities that ECE has prepared Stormwarer Pollution Prevention Plan are:

  • Hubner Building
  • Crownsville Wall

 

Oil Water Separator

Oil Water Separator Design Review

Washington DC

ECE reviewed the design of an existing Oil Water Separator and assisted the client in complying with prevailing regulations by recommending modifications to the design.